OUR PROCESS
FROM CONCEPT TO FINISH
INITIAL SURVEY & CONSULTATION
We inspect the vessel’s deck structure, fairing condition, existing hardware and layout. We discuss finish preferences (golden teak vs natural silver-grey, seam style, margin trim), timeframe and budget.
Templating / Digital Modelling
Whether new-build or refit, we generate accurate templates or 3D scans of the deck area to ensure precise plank layout, alignment and minimised waste.
Fabrication
In our workshop we cut, inspect and prepare each plank for weave, grain and tolerance. We prefabricate panels when applicable for quicker install onsite.
Installation
We remove old decking (if refit), prepare/fair the sub-deck, carefully bond the new teak (including caulking, adhesive, vacuum bag/pressure bar techniques as required) and install margin trim/fixtures with extreme attention to detail.
Finishing & Acceptance
After installation we sand to the correct grit, clean, finish and walk the deck with you for sign-off.
Maintenance Programme
We recommend planned maintenance, including light sanding every 18-24 months (if high use) to preserve finish and water-flow integrity.